It can dive deeper and run quieter than the Los Angeles-class boats. The Seawolf can also employ land-attack Tomahawk missiles. state of Connecticut, going back to 1776. Connecticut is the fifth active United States Ship to be named for the U.S. There are also Harpoon anti-ship missiles, which they can fire through eight tubes. USS Connecticut (SSN-22) is a Seawolf-class nuclear powered fast attack submarine operated by the United States Navy. Seawolf-class has 50 heavy-weight 533-millimeter Mark 48 torpedoes. These subs can run 35-knots submerged and 20-knots in silent mode. The Seawolf-class has redeeming qualities. The exact repairs during a DSRA are classified, but work on sensors that may have alerted the crew before the mishap would have been a welcome addition. If Connecticut had been in drydock for this work, perhaps it could have avoided its accident in 2021 in the South China Sea. Thresher/Permit: 14 USS Thresher (SSN-593) USS Gato (SSN-615) 25 January 1968 First class with bow sonar sphere. Navy reversed itself, beginning the formal process of cancelling the Seawolf class submarine’s big 2021 maintenance period,” according to Craig Hooper of Forbes. The Seawolf class is a class of nuclear-powered, fast attack submarines in service with the United States Navy. First nuclear submarine class with teardrop hull form. “USS Connecticut was expected in early 2020 to enter Puget Sound Naval Shipyard for a year-long ‘Drydocking Selected Restricted Availability,’ or DSRA, in August 2021. Since that report, other maintenance issues have crept up. This made them the priciest vessels for the Navy to work on per day compared with Los Angeles-class or Virginia-class submarines, the GAO found. The Kitsap Sun also said the Seawolf subs had an estimated daily cost of more than $205,000 to operate. Altogether, they were stopped for almost 80-days as they waited to enter dry dock, according to the Kitsap Sun, a Bremerton, Washington publication that keeps track of submarines at Puget Sound. The GAO found that between 20, the three Seawolf-class subs were delayed more than 1,600 days before they completed maintenance periods that were already behind schedule. GAO Report Finds Maintenance Periods Were Behind Schedule Government Accountability Office investigation that studied the Seawolf-class and its maintenance issues as far back as 2017. These setbacks have been going on for years and the navy even succumbed to a U.S. Not only has the Seawolf-class taken some hard knocks, but the submarines have also required extensive and lengthy maintenance schedules that add to their operating costs. An artist’s concept of the nuclear-powered submarine SEAWOLF (SSN-21).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |